The 1 group of crane electric hoist in use, the absolute prohibition in the promised environment, and exceed the rated load and rated closing times per hour (120) use case.
2 not allowed while pressing the two electric hoist movement in the opposite direction of the switch button.
3 after work must take power gate opened, cut off the power supply.
4 should be operated by the operator, the operator should fully grasp the safety operation rules, is strictly prohibited crooked oblique hanging.
The 5 group of crane electric hoist in use must regularly by the specialized staff to check the electric hoist, found that failure to take timely measures, and carefully record.
6 must be used to maintain adequate oil, and keep the oil clean, should not contain impurities and dirt.
You should use a stiff brush or wood piece 7 wire rope oiling, prohibited by hand to the working rope oil. >
8 gourd does not work, do not allow the weight hanging in the air to prevent permanent deformation of parts.
The 9 group of crane electric hoist in use process, if found fault, should immediately cut off the main power supply.
10 should pay special attention to the use of wearing parts.electric hoist www.jcyccrane.com